Analyzing Effect Rate at the Time of Derivative Development
or Occurring a Problem/Change

microTRACER determines which points are linked to a change requirement in derivative development or identifies a causative process and a causative point when a program problem happens and then checks effect rate with trees.
It also used to determine linked locations sort out work estimation (man-hour and schedule) when requirements, specifications, or designs are changed/added/deleted.

Analyzing Effect Rate at the Time of Derivative Development or Occurring a Problem/Change